Calculates economic order quantity (EOQ) and safety stock based on demand variability and lead time for each SKU.
Explodes a two-level bill of materials (semi-finished and raw materials) to calculate material requirements from the production plan.
Daily production scheduling that accounts for line capacity and product changeover sequencing to reduce setup time.
Automatically classifies inventory items by consumption value (ABC) and demand stability (XYZ) to prioritize inventory control effort.
A complete material planning engine with a 36-month horizon for net requirement calculation, order timing, and make/buy suggestions.
A demand forecasting template using moving average and exponential smoothing methods for items with seasonal patterns.