A structured list of every component, raw material, and sub-assembly needed to produce a finished item, along with the quantity of each. A BOM can be single-level or multi-level (with nested sub-assemblies) and is the foundation for MRP explosion.
A structured list of every component, raw material, and sub-assembly needed to produce a finished item, along with the quantity of each. A BOM can be single-level or multi-level (with nested sub-assemblies) and is the foundation for MRP explosion.