The time a production line is down while switching from producing one product to another (e.g. tooling or machine setting changes). Reducing changeover time (such as via SMED methods) enables smaller batch sizes and greater flexibility.
The time a production line is down while switching from producing one product to another (e.g. tooling or machine setting changes). Reducing changeover time (such as via SMED methods) enables smaller batch sizes and greater flexibility.